It included the design, tendering and supervision of the water supply in St Katherine (transmission main 110 km with 4.000 m3/d, altitude differences of 1,600 m, ND 500 steel pipe, 8 booster pumping stations and 7 reservoirs and the design of the wastewater system and WWTP in El Tur.

Water & Environment
Water Supply and Sanitation Project Batman
The project objective was to improve the provision of safe drinking water to the population of the city of Batman (380.000 inhabitants) as well as the hygienically and environmentally sound