It included the design, tendering and supervision of the water supply in St Katherine (transmission main 110 km with 4.000 m3/d, altitude differences of 1,600 m, ND 500 steel pipe, 8 booster pumping stations and 7 reservoirs and the design of the wastewater system and WWTP in El Tur.

Water & Environment
Preparation of a Masterplan and Feasibility Study for the Project Sewage Disposal Kosovo I/II
The Objective of the Project was to improve the collection and treatment of wastewater, as well as the management of storm water.