It included the design, tendering and supervision of the water supply in St Katherine (transmission main 110 km with 4.000 m3/d, altitude differences of 1,600 m, ND 500 steel pipe, 8 booster pumping stations and 7 reservoirs and the design of the wastewater system and WWTP in El Tur.

Water & Environment
Communal Infrastructure Program (CIP) II, Phase 3 – Armenia, Water and Sanitation Water supply network and sewer systems of the Lori CJSC and the Nor Akunq CJSC service areas
The Project concerns the rehabilitation, renewal, and extension of the water supply network as well as some urgent measures in the sewer system of the regional Water Utilities Lori CJSC


