It included the design, tendering and supervision of the water supply in St Katherine (transmission main 110 km with 4.000 m3/d, altitude differences of 1,600 m, ND 500 steel pipe, 8 booster pumping stations and 7 reservoirs and the design of the wastewater system and WWTP in El Tur.

Water & Environment
Wastewater System Alexandria, Amriya District
The principal objective of the project was to provide appropriate and sustainable sanitation services in the project area of the Amriya District.


