The consulting services included the preparation of a preliminary design, ESIA, and detailed design as well as the bidding documents, assistance during tendering and construction supervision for the network measures (incl. ca. 173 km network, ring feeder and transmission mains, ca. 7.000 house connections, two reservoirs and reconstruction of 3 mountain river intakes) and a feasibility study and conceptual design and bidding documents for the new WWTP Armavir-Metsamor (46,500 PE, incl. main pressure pipeline, sewerage pumping station).

Water & Environment
Greater Mersin Water/Wastewater Project, Technical Assistance for Project Management Unit
The services included the turnkey design and superstructure management of the new WWTP in Mersin (1.05 million PE, 190.000 m³/day) including a sea outfall (2000 mm, 2 km), and measures