The services included the preparation of a Feasibility Study, Conceptual and Detailed Design, bidding documents, and assistance during tendering and supervision of the water supply network (including new well field area, water reservoirs, main pumping station, transmission main, 20 km new network), the stormwater network (including 4 retention basins, rehabilitation and extension of existing main storm water drains ca 17,4 km), the wastewater network (including ca. 17 km pipelines), and the WWTP (300.000 PE; 61.000m³/day).

Water & Environment
Greater Mersin Water/Wastewater Project, Technical Assistance for Project Management Unit
The services included the turnkey design and superstructure management of the new WWTP in Mersin (1.05 million PE, 190.000 m³/day) including a sea outfall (2000 mm, 2 km), and measures