The services included the preparation of a Feasibility Study, Conceptual and Detailed Design, bidding documents, and assistance during tendering and supervision of the water supply network (including new well field area, water reservoirs, main pumping station, transmission main, 20 km new network), the stormwater network (including 4 retention basins, rehabilitation and extension of existing main storm water drains ca 17,4 km), the wastewater network (including ca. 17 km pipelines), and the WWTP (300.000 PE; 61.000m³/day).

Water & Environment
Preparation of a Masterplan and Feasibility Study for the Project Sewage Disposal Kosovo I/II
The Objective of the Project was to improve the collection and treatment of wastewater, as well as the management of storm water.