The region will benefit from the newly created jobs in modern factories and / or service industries of the JIFZ.
With this project an industrial estate (890.000 m2) in Greater Jenin will be established adjacent to the Green Line border with Israel.
The services included the detailed design and bidding documents, ESIA, assistance during tendering, and construction supervision for the entire infrastructure of the JIFZA area consisting of a 4th transformer unit (45 MVA), a WWTP compact unit, main water pipeline, connection pipelines, reservoir (6.000 m³), water tower (height 28 m, volume 500m³) and pumping station (110l/s, 33 m head), roundabout and access road, street lighting and telecommunication system, storm water connection to Wadi, Water supply distribution and sewer network, on-site roads and pavements, power networks, storm water drainage system.