The project included the preparation of the conceptual design, detailed design, and bidding documents, and the provision of supervision services for the entire water supply treatment/ distribution system, as well as the supervision of the wastewater discharge/ treatment of the Military Camp Marmal in Mazar-e-Sharif.

Water & Environment
Greater Mersin Water/Wastewater Project, Technical Assistance for Project Management Unit
The services included the turnkey design and superstructure management of the new WWTP in Mersin (1.05 million PE, 190.000 m³/day) including a sea outfall (2000 mm, 2 km), and measures


