The services included the preparation of a feasibility study, ESIA, conceptual/ detailed design and bidding documents for the WWTP (0.6 Mio. PE, 100,000 m³/d) and Network (main pumping station 12.000 m³/h, 110 km gravity lines, 8 km pressure lines, two new lifting stations, enlargement of four existing pumping stations), assistance in tendering and construction supervision.

Urban development
Rural Damascus Water and Sanitation Project Contract S1
The contract was part of the Damascus Rural Water and Sanitation project (DRWSP) providing an integrated program of water supply and wastewater infrastructure rehabilitation and construction to two refugee camps