It included the design, tendering and supervision of the water supply in St Katherine (transmission main 110 km with 4.000 m3/d, altitude differences of 1,600 m, ND 500 steel pipe, 8 booster pumping stations and 7 reservoirs and the design of the wastewater system and WWTP in El Tur.

Transport & Infrastructure
Consulting Services for Off-Site and On-Site Infrastructure for Jenin Industrial Free Zone
The overall developmental objective is the creation of new jobs in the formal sector and thus contributing to the reduction of poverty in the West Bank.