It included the design, tendering and supervision of the water supply in St Katherine (transmission main 110 km with 4.000 m3/d, altitude differences of 1,600 m, ND 500 steel pipe, 8 booster pumping stations and 7 reservoirs and the design of the wastewater system and WWTP in El Tur.

Water & Environment
Water Supply and Sanitation in Provincial Towns Program II (PTP II), Lot 1: Project Towns of Ja’ar and Zinjibar
The program objective was to reduce the physical and administrative water losses and to improve water use efficiency and thereby contribute to increased water resources availability, to improve the reliability