It included the design, tendering and supervision of the water supply in St Katherine (transmission main 110 km with 4.000 m3/d, altitude differences of 1,600 m, ND 500 steel pipe, 8 booster pumping stations and 7 reservoirs and the design of the wastewater system and WWTP in El Tur.

Water & Environment
Camp Marmal, Mazar-e-Sharif – Water Treatment, Water and Wastewater Network
The project included the preparation of the conceptual design, detailed design, and bidding documents, and the provision of supervision services for the entire water supply treatment/ distribution system, as well