The services included the turnkey design and superstructure management of the new WWTP in Mersin (1.05 million PE, 190.000 m³/day) including a sea outfall (2000 mm, 2 km), and measures in the wastewater network (total 84 km), sewage force mains (2x DN 1600, total 21 km), and rehabilitation and upgrading of 10 pumping stations.

Water & Environment
Water Supply and Sanitation in Provincial Towns Program II (PTP II), Lot 1: Project Towns of Ja’ar and Zinjibar
The program objective was to reduce the physical and administrative water losses and to improve water use efficiency and thereby contribute to increased water resources availability, to improve the reliability