The services included the turnkey design and superstructure management of the new WWTP in Mersin (1.05 million PE, 190.000 m³/day) including a sea outfall (2000 mm, 2 km), and measures in the wastewater network (total 84 km), sewage force mains (2x DN 1600, total 21 km), and rehabilitation and upgrading of 10 pumping stations.

Water & Environment
Camp Marmal, Mazar-e-Sharif – Water Treatment, Water and Wastewater Network
The project included the preparation of the conceptual design, detailed design, and bidding documents, and the provision of supervision services for the entire water supply treatment/ distribution system, as well