The services included the preparation of a feasibility study, ESIA, conceptual/ detailed design and bidding documents for the WWTP (0.6 Mio. PE, 100,000 m³/d) and Network (main pumping station 12.000 m³/h, 110 km gravity lines, 8 km pressure lines, two new lifting stations, enlargement of four existing pumping stations), assistance in tendering and construction supervision.

Urban development
Water Supply and environmental protection Lake Shkodra
The Project Aims To Ensure A Sustainable, Ecologically And Hygienically Safe Water Supply And Wastewater Collection In The City Of Shkodra.