SRP developed a Master Plan for long-term investments for the entire service area of the RWCP, and a Feasibility Study for short- and medium measures for the Cities of Pristina, Fushë Kosovë, Obiliq and other agglomerations. These measures will serve in future for more than 600.000 people and will significantly help to improve the living condition and will finally support Kosovo in its efforts to comply with the EU Environmental Legislation. The scope of the Master Plan comprised the hydraulic analysis and conceptual design of the combined sewage system of more than 35 villages with more than 2.000 inhabitants (total length more than 6.000 km networks) and 7 wastewater treatment facilities with sizes from 4.500 PE to 415.000 PE. The Feasibility Study comprised preliminary design of 40 km of Sewer Trunk Main, 4 Pumping Stations, ESMMP and several other accompanying studies.
Technical Audit of WW collection & treatment systems in North Macedonia, preparation of documents for Supply of Water Equipment for Radovish, Kichevo, Strumica, Prilep, Berovo, Kumanovo, Bitola & Tetovo
The overall objective to which this action contributes ism to minimize the adverse effects of inappropriate wastewater and sewage sludge management in larger North Macedonia’s agglomerations.