In cooperation with COWI, SRP is planning the approx. 2.2 km long ramp section on Fehmarn. In addition to the new construction of a 4-lane motorway section and a 2-track railway line, the TPR contract also includes reconstruction/adaptation work on the municipal traffic route network. Also part of the contract is the planning of all necessary structures (bridges, culverts, traffic sign bridges, toll station, pumping stations, etc.). The entire project is being worked on entirely according to the Open BIM methodology. This means that all planning contents are modelled as 3D volume bodies/objects.

Transport & Infrastructure
Highway B 303, Bypass Schirnding
Design of the extension of the B 303 from 2 to 4 lanes over a length of 2.54 km by adding a 2nd lane (RQ 21). Maintenance of traffic on