The programme objective was to improve access to drinking water as well as the reduction of the water losses and the improvement sanitation conditions in the program area.
The services included the review of the FS, the preparation of the Final Design and bidding documents, assistance during Tendering, construction Supervision and assistance during commission and DNP, as well as some accompanying measures including technical/ financial training and awareness raising campaigns.
The works were implemented in several lots covering basically ca 110 km of steel pipes (DN 150 to DN 50) and ca. 245 km of HDPE pipes (DN 100 to DN 20), installation of bulk water meters, hundreds of valves, a pumping main 7,5 km, 9 booster pumping stations, 5 water towers, reservoirs.