The project included the preparation of the conceptual design, detailed design, and bidding documents, and the provision of supervision services for the entire water supply treatment/ distribution system, as well as the supervision of the wastewater discharge/ treatment of the Military Camp Marmal in Mazar-e-Sharif.

Urban development
Climate Appropriate Urban Development: Sewage Prishtina (incl. Sewage I/II)
The project objectives are to contribute to environmentally friendly, hygienically safe, and sustainable wastewater and stormwater management, in line with the national wastewater and resource protection strategy, while fostering alignment


