The services included the preparation of a feasibility study, ESIA, conceptual/ detailed design and bidding documents for the WWTP (0.6 Mio. PE, 100,000 m³/d) and Network (main pumping station 12.000 m³/h, 110 km gravity lines, 8 km pressure lines, two new lifting stations, enlargement of four existing pumping stations), assistance in tendering and construction supervision.

Water & Environment
Open Programme Municipal Infrastructure II Water Supply and Wastewater Systems in Ganja and Sheki
The Project Aimed To Improve Quality, Reliability And Sustainability Of Water Supply And Sanitation Services In The Cities Of Ganja (334.000 Inhabitants) And Sheki (65.000 Inhabitants) And Hence To Improve