Design of the extension of the B 303 from 2 to 4 lanes over a length of 2.54 km by adding a 2nd lane (RQ 21). Maintenance of traffic on the B 303 and partly also on the intersecting traffic routes, including construction of under- and overpasses, two new rainwater retention tanks and drainage facilities, reconstruction of an existing rainwater retention tank.

Transport & Infrastructure
Consulting Services for Off-Site and On-Site Infrastructure for Jenin Industrial Free Zone
The overall developmental objective is the creation of new jobs in the formal sector and thus contributing to the reduction of poverty in the West Bank.


