The consulting services included the preparation of a preliminary design, ESIA, and detailed design as well as the bidding documents, assistance during tendering and construction supervision for the network measures (incl. ca. 173 km network, ring feeder and transmission mains, ca. 7.000 house connections, two reservoirs and reconstruction of 3 mountain river intakes) and a feasibility study and conceptual design and bidding documents for the new WWTP Armavir-Metsamor (46,500 PE, incl. main pressure pipeline, sewerage pumping station).

Water & Environment
Water Supply and Sanitation Project Batman
The project objective was to improve the provision of safe drinking water to the population of the city of Batman (380.000 inhabitants) as well as the hygienically and environmentally sound