The consulting services included the preparation of a preliminary design, ESIA, and detailed design as well as the bidding documents, assistance during tendering and construction supervision for the network measures (incl. ca. 173 km network, ring feeder and transmission mains, ca. 7.000 house connections, two reservoirs and reconstruction of 3 mountain river intakes) and a feasibility study and conceptual design and bidding documents for the new WWTP Armavir-Metsamor (46,500 PE, incl. main pressure pipeline, sewerage pumping station).

Water & Environment
Mezitli Wastewater Treatment Plant
The main purpose of the project was to develop the quality and the reliability of wastewater treatment services in Mersin province to reduce the level of pollution in Mersin Gulf