The consulting services included the preparation of a preliminary design, ESIA, and detailed design as well as the bidding documents, assistance during tendering and construction supervision for the network measures (incl. ca. 173 km network, ring feeder and transmission mains, ca. 7.000 house connections, two reservoirs and reconstruction of 3 mountain river intakes) and a feasibility study and conceptual design and bidding documents for the new WWTP Armavir-Metsamor (46,500 PE, incl. main pressure pipeline, sewerage pumping station).

Water & Environment
Open Programme Municipal Infrastructure II Water Supply and Wastewater Systems in Ganja and Sheki
The Project Aimed To Improve Quality, Reliability And Sustainability Of Water Supply And Sanitation Services In The Cities Of Ganja (334.000 Inhabitants) And Sheki (65.000 Inhabitants) And Hence To Improve