The services included the preparation of a Feasibility Study, Conceptual and Detailed Design, bidding documents, and assistance during tendering and supervision of the water supply network (including new well field area, water reservoirs, main pumping station, transmission main, 20 km new network), the stormwater network (including 4 retention basins, rehabilitation and extension of existing main storm water drains ca 17,4 km), the wastewater network (including ca. 17 km pipelines), and the WWTP (300.000 PE; 61.000m³/day).

Water & Environment
Architectural and Engineering Services for the Water Supply in St Katherine and Wastewater Management in El Tur, South Sinai
This project was initiated as part of the South Sinai Regional Development Programme (SSRDP) to develop the local economy, to preserve and support the social, cultural, and natural resources of