The services included the preparation of a Feasibility Study, Conceptual and Detailed Design, bidding documents, and assistance during tendering and supervision of the water supply network (including new well field area, water reservoirs, main pumping station, transmission main, 20 km new network), the stormwater network (including 4 retention basins, rehabilitation and extension of existing main storm water drains ca 17,4 km), the wastewater network (including ca. 17 km pipelines), and the WWTP (300.000 PE; 61.000m³/day).

Transport & Infrastructure
Consulting Services for Off-Site and On-Site Infrastructure for Jenin Industrial Free Zone
The overall developmental objective is the creation of new jobs in the formal sector and thus contributing to the reduction of poverty in the West Bank.