Preparation of a Feasibility study with the aim to investigate options for immediate potable water supply using containerized water treatment facilities to relieve the grave supply situation in Samarkand and Navoi with respect to safe and healthy water consumption.

Water & Environment
Preparation of a Masterplan and Feasibility Study for the Project Sewage Disposal Kosovo I/II
The Objective of the Project was to improve the collection and treatment of wastewater, as well as the management of storm water.


